/ 2 min read
Not every decision starts with a document
You can document the meetings, the drawings and the decisions. What happened in someone’s head before the idea is harder to capture.

Some start at a red light.
Every project I’ve been part of has had a process. Requirements, architecture, development, testing, documentation.
I spent years building regulated software for pharma, where documentation was part of almost everything we did. For good reason. Someone needs to understand why a system was built the way it was, long after the people who designed it have moved on.
But I’m starting to build again, and I’ve been thinking about what those processes actually capture.
You can document the meetings, keep every drawing and record every design decision, including the ideas that were rejected.
What you can’t easily capture is what happened in someone’s head before they suggested something nobody else had considered. The connection to a problem they solved ten years ago. A thought that occurred on the drive home.
You can write down the reasoning afterwards. You should, especially when other people need to build on it.
I’ve never seen a development process that captures how ideas take shape.
And I’m not sure it needs to.